manhole at site (2/12/09)
encik zaki from syabas visit the site on 9/2/10

pressure test by syabas, pressure result = 5 bar (24/2/10)
chlorine test done; Syabas confirmed that pipe still active
Read More...
manhole at site (2/12/09)
encik zaki from syabas visit the site on 9/2/10

pressure test by syabas, pressure result = 5 bar (24/2/10)
chlorine test done; Syabas confirmed that pipe still active
1st maintain load test for 200mm x 200mm RC pile (start 1030-24/2/10 ---> finish 1030-26/2/10)
Today Jurukur Teguh (owner's surveyor)confirmed that neighbouring lot (PT 33302)wall fencing encroached into our site 658mm, 484mm and 283mm.
Previously contractor's surveyor (Jurukur Ehsan) reported that the lot PT33302 wall fencing into our site about 600mm. The survey was done based on latest CP drawing
Read More...