Welcome to Perunding Bersatu's Blog at Bukit Jelutong Site, Shah Alam

Feb 25, 2010

syabas pipe



manhole at site (2/12/09)







encik zaki from syabas visit the site on 9/2/10






pressure test by syabas, pressure result = 5 bar (24/2/10)





chlorine test done; Syabas confirmed that pipe still active



Read More...

load test


1st maintain load test for 200mm x 200mm RC pile (start 1030-24/2/10 ---> finish 1030-26/2/10)










Read More...

Feb 24, 2010

1st pile


piling work opening ceremony by mr chairman on 10/2/10





Read More...

Jan 19, 2010

latest boundary survey

Today Jurukur Teguh (owner's surveyor)confirmed that neighbouring lot (PT 33302)wall fencing encroached into our site 658mm, 484mm and 283mm.

Previously contractor's surveyor (Jurukur Ehsan) reported that the lot PT33302 wall fencing into our site about 600mm. The survey was done based on latest CP drawing

view near lot 9


view near lot 21 and lot 27

Read More...

Jan 10, 2010

artist impression







Read More...